Login
Servicios » Energía Eléctrica » Estudios Eléctricos y Comercialización
 Power Minimize
  
 Electrical Systems Analysis Minimize

The Electrical Studies and Testing Area conducts electrical studies and protection coordination for electric generation, transmission distribution and industrial systems. Thorough testing of substation and power generation plants, including:

  • Power systems long, medium, and short term planning
  • Load flow and short circuit studies
  • Transient and dynamic stability studies
  • Load characterization studies
  • Arc-flash studies
  • Motors starting analysis
  • Reactive power compensation studies
  • Electromagnetic transient Studies
  • Insulation coordination
  • Harmonic analysis
  • System reliability analysis
  • Power Quality (PQ) Studies
  • Electrical losses evaluation in transmission systems
  • Transmission flexible A.C. system studies (FACTS)
  • Frequency and voltage control studies
  • Reactive series and shunt static compensation studies (SVC)
  • Temporary, switching, and lightning over voltage studies
  • Earthing system design
  • Lightning protection system design
  • Protection coordination studies
  • Detailed relay setting
  • Protection system selection and specification
  • Event repot analysis
  • Substations and Power Plants testing and commissioning, including: High voltage equipment, transformers, auxiliary supply systems, regulation equipment, and control and protection systems
  • Grounding systems resistance measurements
  • Satellite synchronized “end-to-end” protection testing
  • Consultancy services in commercialization of electrical energy in subjects like: power contracting, rate analysis, Electrical assets appraisal

Some of the software tools used for the electrical studies are:

  • DigSILENT y ETAP: Power systems analysis and protection coordination
  • MVMT:  Grounding systems design and analysis
  • ATP y ATP dRA: Transient studies
  
 Outstanding Projects Minimize

 

 

 

Protection system Modernization SICN - ETECEN

Planning and coordination of protections of the interconnected electrical system

Project for the upgrade of the Guando's Oil Field

Connection study for the Sogamoso 800 MW Hydro power plant

Protection Coordination of Electricaribe - Electrocosta System

  

Calle 70 No. 7-30
Bogotá D.C.

Tel. (571) 643-95 00
Fax (571) 211-45-77

Calle 8 No. 43C-101
Barrio Astorga - Poblado
Medellín, Antioquia

Tel. (574) 370-6666
Fax (574) 312-2298
hmv@h-mv.com
Copyright 2008 ® HMV Ingenieros   Terms Of Use   Privacy Statement