Wallerfield 132/66/12 kV Substation
Customer: T&Tec
 
 
Country:  Trinidad y Tobago End Date:  In construction
Project Description: Construction of the Wallerfield 132/66/12 kV substation and the Wallerfield-Pinto Road 66 kV transmission line. TRINIDAD Y TOBAGO
Scope of Work: Wallerfield substation: EPC (Turn-key project). The scope of works includes: detailed engineering, civil works, equipment procurement, installation, testing and commissioning. The substation comprises a 132 kV switchyard with 4 line bays and 4 transformer bays, a 66 kV switchyard with 8 line bays and 2 transformer bays, a 12 kV metalclad switchgear with 15 circuits, distributed control system, Scada, protection panels, conventional control and auxiliary services.

Wallerfield-Pinto Road 66 kV transmission line : EPC (Turn-key project). The scope of works includes: detailed engineering, civil works, equipment procurement, installation, testing and commissioning of a 66 kV, 7 km long, double circuit transmission line, from Wallerfield to Pinto Road, with lattice-type towers and 12 fiber OPGW.